Construction site, mechanical civil engineering, housing modeling, urban development, stakeholders, tools, window, concrete, hammer, mortar, polyane film, foundations, cadastral points, earthworks, water connection, mount a wall, building dimensions, control housing, internship period
For the purpose of obtaining the degree in Mechanical Civil Engineering (GCM). At the end of the third year, each student must complete an internship in a company (or communities or design office).
It is an opportunity for the student to discover the world of work and to really understand the place that an intern holds within a company by valuing his knowledge acquired during these three years of bachelor's degree.
[...] This experience within the company allowed me to confront myself directly with the world of work to see the issues that are vital for the company and to make decisions in a limited time that allows the company to judge the quality of the work that I myself undertook for their personal account. The works and projects I worked on allowed me to gain experience in the field of building as well as civil engineering. In addition, I was able to work with all the workers on the site who share their know-how. [...]
[...] The fact of being an intern in License 3 is a godsend, because you are very versatile. So, this internship was exciting even if it also required a lot of professionalism and especially a very big effort of personal investment Genius. Finally, this internship will have taught me a lot in all areas and these two months will have made me evolve a lot towards my profession of engineer. Bibliography http://www.cstb.fr/ [HYPERLINK: http://www.cstb.fr/] It is one of the most important sites and it is also one of the companies whose building optimization occupies a large place, and it is also a commitment to quality and reliability, because most of the materials I worked on had their logo. [...]
[...] Electricity and water connection The penultimate step concerns the connection. It consists of connecting the fittings intended to collect the electrical cables and channels of the water supply. Apart from these elements to consume daily, there are telephone cables, the Internet and television, the gas duct as well as sewers. The owner has two options regarding the placement of some of these fittings. The first is overhead wiring. The second concerns their buried installation. Most of these works scrupulously adhere to well-defined standards. [...]
[...] Activities on a construction site Thanks The presence of an intern within a company is sometimes an additional workload, so I want to thank the site staff who gave me a chance to work with them. I would like to express my gratitude to my work manager for welcoming me as an intern within the company. I would also like to thank, site managers who took me into their team on the M. site as well as a site manager for all his advice. [...]
[...] Acquired know-how Control and have a correct tolerance. Comparative studies The accommodation of the lemon tree These homes which are also located in Saint-L near the housing under construction that was delivered on May and can hold 46 housing units was much faster to implement to this one. Both projects were carried out by the same site manager, but what is different is that on the site of the lemon tree that I had the chance to see the stakes as well as the pressures are not the same, because there was problems of land expropriation. [...]